GW investigating new water storage option
GW investigating new water storage option at Kaitoke
Greater Wellington has secured an option to buy land owned by AgResearch at Kaitoke, adjacent to State Highway 2, with the intention of investigating the land to find out if it’s suitable for a water storage lake.
“The size of the proposed lake will be determined during the investigations but it could have a capacity of around 5,000 million litres – making the volume around 50% larger than the two Stuart Macaskill water storage lakes combined,” says Greater Wellington’s Utilities and Services General Manager Murray Kennedy.
Water for the proposed lake would be piped from near the Te Marua Water Treatment Plant, using the existing Kaitoke weir resource consent. The lake would allow Greater Wellington to capture more of the water when there is high rainfall but would not affect river levels at times of low flow.
The investigations are likely to begin in November and could take up to 12 months. They will include investigations into geological/geotechnical and civil works as well as environmental, social and cultural issues.
Murray says that if the site is seen as being suitable for a storage lake, it will be evaluated along with other options that Greater Wellington has previously investigated for future water supply.
“If the proposed lake is built, a dam or another water storage lake probably won’t be needed for about 20 years. If a new storage lake isn’t built soon, it’s likely that a dam would need to be built within 10 years. However, timing will depend to some extent on household and commercial water usage, with Greater Wellington remaining committed to reducing per capita water consumption.”
Murray says that if a decision is made to proceed with the project, the public would have the opportunity to have their say on the project through Greater Wellington’s Long Term Plan process and the Resource Management Act’s resource consent process.
If the project proceeds, construction is likely to take two to three years to complete after the necessary consents and approvals are obtained. The cost of purchasing the land would be determined through Greater Wellington’s negotiations with AgResearch.
Greater Wellington is
responsible for supplying bulk water to the Upper Hutt,
Hutt, Wellington and Porirua city councils.
Background information
Q&As (below) and maps
of the area being investigated
(attached)
Investigation into a potential water
storage lake – Questions & Answers
• Why is
Greater Wellington investigating another water storage lake?
Isn’t the Whakatikei dam the preferred water supply
development option?
Although Whakatikei was confirmed
as a preferred dam site in 2009, Greater Wellington has
continued to look at other options to ensure the region has
a secure water supply at a cost effective price.
Preliminary indications are that a new water storage
lake at Kaitoke may be cheaper to construct than the
Whakatikei dam and may have a lower environmental impact.
Following the investigations, a comparison would be made of
the benefits and impacts of a water storage lake at Kaitoke
with the Whakatikei site.
• How big would the lake
be?
The investigations will determine potential lake
size, but we think a lake of 5,000 million litres could be
possible. That is a volume about 50% larger than both of the
Stuart Macaskill Lakes combined but smaller than the
proposed storage volume of the Whakatikei dam.
• If
a lake is built, how long will the construction
take?
If the investigation concluded that a water
storage lake could be built here and it is confirmed as the
preferred alternative to the Whakatikei Dam for water supply
development, then we would expect that construction could
take between two and three years to complete. Time to
obtain the necessary consents would be additional to
this.
• Will investigations have an impact on
properties near the site? And will there be an impact if
Greater Wellington decides to proceed with construction?
Neighbouring occupants may notice minor drilling and
excavation activities during the investigation stage of the
project but this is only expected to take a few weeks in
total. If we decide to proceed with the construction of the
proposed lake there would be some impact from construction,
such as earthworks and truck movements. We would consult
those affected before any works start.
• Who is
doing the investigation work? What does it involve?
A
major consulting company will be commissioned to carry out
most of the investigation work, which will include
geological/geotechnical and civil works as well as an
investigation into any environmental, social, and cultural
issues. Some of the work will be carried out by Greater
Wellington. The geological/geotechnical investigation will
require some sub-soil testing bores to be drilled and minor
excavation work.
• How much water will the proposed
lake supply and for how many people?
A lake of 5,000
million litres would provide enough water to supply the
average daily water needs (150 million litres per day) of
residents in Porirua, Lower Hutt, Upper Hutt and Wellington
for around 33 days.
• Where will the water come
from?
Water for the proposed lake would come from the
existing pipeline near the Te Marua Water Treatment Plant,
using water from Kaitoke weir. It is also possible that
water could come from the Pakuratahi River in the
future.
• What will the environmental impact
be?
We don’t know at this stage. The investigations
over the next 12 months will help to determine all possible
environment impacts.
• Will a new lake mean more
water is taken from the Hutt River?
The proposed lake
would allow Greater Wellington to capture more of the water
available when there are higher river levels, but would not
affect river levels at low flow. Water taken from the Hutt
River at the Kaitoke Weir would be in accordance with
resource consents for that purpose.
• Why didn’t
you investigate this option earlier?
The opportunity
to purchase this land has only recently become available.
Other options in the general area have been considered but
were not preferred options, including a dam on the
Pakuratahi river.
• If a new lake is built, does
this mean that we won’t need to build the Whakatikei or
another dam in the future?
No. But if the proposed
lake is built, it will mean that a dam or another water
storage lake won’t be needed for perhaps 20 years, or
longer if there is reduced demand for water. When more
water supply is needed the option of a dam on the Whakatikei
would still be available. However if we don’t build a
storage lake it is possible the Whakatikei dam will need to
be built within 10 years.
• Why is a water storage
lake being considered when water meters could lower
household consumption, therefore delaying the need for a
lake or dam?
Any decision the City Councils may make
on domestic water meters would benefit from considering both
demand side and supply side options. The information that
will be gained from the investigation into the storage lake,
including its cost estimate, will assist in evaluating the
supply side options.
• Won’t further delay in
building a dam have a severe impact on the security of the
water supply?
Per person and total annual water
consumption has dropped over the last couple of years. This
is probably due to a number of factors including: city
council efforts to fix leaks, repair and replacement of
pipelines, the increasing use of more efficient domestic
appliances, showers and dual flush toilets, water
conservation by users, climate affecting water use and the
recession. The effect of this reduction has been to improve
our security of water supply, which gives us more time to
further reduce demand and/or build more water
supply.
• How much will it cost Greater Wellington
to buy the land?
If Greater Wellington decides to
purchase the land it would be bought at the market rate. The
value would be determined as part of our negotiations.
• How big is the land that Greater Wellington is
looking at purchasing?
The AgResearch Ltd land covers
approximately 215 hectares over a number of titles on both
sides of SH2 at Kaitoke. Not all of this land area would be
needed for the proposed lake.
• What will Greater
Wellington do with the land it doesn’t need for the
lake?
If Greater Wellington goes ahead with the lake,
a part, or all, of the remaining land could be leased for
farming purposes. There may an opportunity to use this land
to improve public access from one end of Kaitoke Regional
Park to the other
• Will the design of the proposed
lake be similar to the existing Stuart Macaskill
lakes?
In general terms – yes. The proposed lake
would consist of natural and constructed earth embankments
(most likely internally lined, as planned for the upgrade to
the Stuart Macaskill lakes) and depending on the lake bed
structure, the lake could be fully lined.
• If the
lake is built, will it be available for recreational
purposes?
Greater Wellington believes that it is
inappropriate to permit recreational access to the Stuart
Macaskill lakes that store water meant for drinking. This
principle is likely to apply to any new water storage
lake.
• When will Greater Wellington consult with
the local community? When do I get to have a say?
If
this option is found to be suitable for a storage lake, and
is the preferred alternative to the Whakatikei Dam for water
supply development, people will have the opportunity to have
their say through Greater Wellington’s Long Term Plan
process and also through the Resource Management Act’s
resource consent process.
• Why is the lake being
built on/near the Wellington Fault? Doesn’t that
compromise it as a secure source of water?
An
important part of the feasibility study, which we’re about
to begin, is to confirm the location and potential impact of
the Wellington Fault on a lake structure. This information
would allow the design of the lake embankments to provide
secure containment of the water in the event of an
earthquake.
ENDS