Scoop has an Ethical Paywall
Licence needed for work use Learn More

Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Papakura Station upgrade to bring station into the future

30 May 2012

Papakura Station upgrade to bring station into the future

Papakura Station will move a step closer into the future with the next stage of upgrade works starting Queens Birthday Weekend.

Auckland Transport and KiwiRail are taking the opportunity of the Queen’s Birthday Weekend rail network closure to switch signalling systems and carry out work which will modernise the station, meet future patronage growth and prepare it for electrification.

From Tuesday 5 June passengers will be directed to the island platform 1 and 2 while the first stage of work is being carried out to the station entry and platforms alongside Railway St West.

The station’s Kiss and Ride parking and ticket office will close and customers can purchase concession tickets from two nearby agencies; Brandy’s Café, 2/14 Railway Street and Stop N Save, 192 Great South Road.

On Saturday 2 June the Papakura Signal Box will close, to be replaced by an automated signalling system. It will end more than 80 years of manual signalling at the station.

One man who has seen many changes to the Auckland rail network is Veolia signaller Tom Davies. He has been working at Papakura Station for 21 years and in the rail industry for 43 years.

He is part of the team responsible for signalling the trains through the section of track between Wiri and Papakura.

“The lever operated mechanical signals were installed here in the 1930’s and although they are safe and reliable they do need to be upgraded because with all the current and the old metal levers in the system, there will be a risk of electrocution once the new overhead wires going in.

Advertisement - scroll to continue reading

“I think it’s great the old signal panel will be kept on display in the ticket office, which is also a heritage building, to show people how we used to do it in the old days and how far we have come technologically on the railways for the early 1900s,” says Mr Davies.

Veolia signalling staff will be there to witness the last signal given on Saturday 2 June before the office is decommissioned. The signalling equipment will stay and be relocated to the west side of the station along with the old wooden ticket building. The old heritage building will be refurbished into a ticketing office and information kiosk and space for public toilets.

Features of the station upgrade include; an enlarged Park and Ride, improved Kiss n Ride drop off, additional platform shelters and furniture, CCTV, lighting and PA upgrades, passenger information displays and refurbished ticketing office and information kiosk.

At the same time KiwiRail is undertaking a major re-arrangement of the tracks and platforms to provide a dedicated freight line through the station, and optimise track and platform layout in preparation for electrification.

About Auckland Transport

Auckland Transport is a Council Controlled Organisation (CCO) of Auckland Council. It is responsible for all of the region’s transport services (excluding state highways) - from roads and footpaths, to cycling, parking and public transport.

Among its main tasks are:

For more information go to www.aucklandtransport.govt.nz.

• To design, build and maintain Auckland’s roads, ferry wharves, cycleways and walkways.
• Co-ordinate road safety and community transport initiatives such as school travel
• Plan and fund bus, train and ferry services across Auckland.

ENDS

© Scoop Media

Advertisement - scroll to continue reading
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 
 
 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured News Channels


 
 
 
 

Join Our Free Newsletter

Subscribe to Scoop’s 'The Catch Up' our free weekly newsletter sent to your inbox every Monday with stories from across our network.