Schools re-open this week after the Christmas and New Year holidays. Please take care around schools and be alert for children cycling on and crossing the roads.
Woodham Road – Gloucester Street intersection, restrictions for about 4 months
• Please support your local
businesses that are currently affected by this work.
•
Wastewater repairs mean lane reductions and turning
restrictions at the intersection.
• Temporary
traffic lights are in place to help traffic flow.
Ferry Road, Woolston
A section of
the storm water network is being repaired on Ferry Rd just
east of Ensors Rd for about 8 weeks.The works may cause
delays.
Addington, night works
• Wastewater repairs at night, on
a section of Brougham St, near the junction
with the Southern Motorway, and Selwyn St near Hazeldean Rd,
are starting and should take a week to complete.
•
Be aware of lane width reductions.
Bealey
Avenue, eastbound, reduced lanes
Bealey Ave
between Madras St and Packe St has reduced lanes for
wastewater repairs. Please look out for merging traffic and
especially consider cyclists.
Hills Road, Shirley, reduced lanes
• From January
25 SCIRT is working on Hills Rd between Warden St and
Shirley Rd for about 3 months repairing storm water, roads,
footpaths..
• Bus and cycle lanes are closed to
make room for the worksite and to maintain two-way traffic.
Please watch for and take care around cyclists.
•
Hills Rd is one way northbound between Guild St and Dudley
St.
Fendalton Road,
Fendalton
Please watch for lane shifts while
storm water repairs are carried out between Deans Ave and
Holmwood Rd.
Avonside Drive,
Avonside
Between Fitzgerald Ave and Stanmore Rd,
Avonside Drive is one way going west towards the city for
road and kerb repairs. Traffic travelling east is being
detoured into Stanmore Rd and Gloucester St.
Moorhouse Ave, night works
•
Between Hagley Ave and Stewart St, Moorhouse Ave going east
will have a reduced lane at night for 10 days from Sunday 31
January.
• Moorhouse Ave overbridge is reduced
to one lane each way for the duration of the repair
project.
Worcester Street, Linwood, major wastewater repairs
• Worcester St is
closed between Woodham Rd and Dacre St with limited access
to residents only.
• It remains one-way
southbound between Wyon St and Linwood Ave.
Shirley Road, short detour
Traffic
going eastwards towards The Palms shopping centre is being
detoured, because of culvert repairs at Stapletons Rd. The
detour uses Emmett St, Orontes St and Quinns Rd and back
onto Shirley Rd.
Beach Road, New Brighton, major wastewater and storm water works underway
• There are major work sites
in Beach Road between Ascot Avenue and Bower Avenue, and
between Bower Avenue and Effingham Street.
•
Beach Rd is currently closed between Ascot Ave and
Flemington Street, and between Bower Avenue and Effingham
St.
• The section outside the shops -Naked
Baker, Beach Road Fish Supply and North Beach Dairy- is open
one way westbound, and parking has been maintained. Please
continue to support these local businesses.
New
Brighton Road, Burwood, between Bassett St and
Anzac Drive is closed for installation of 2 wastewater
pressure mains. The detour is via Bassett St, QE11 Dr and
Travis Rd. The work is for 5 months.
Aranui-
Wainoni
There are several road closures in this
area. Please take extra care around these suburbs where
SCIRT is installing a new resilient vacuum wastewater
system. See the Aranui map for road closures, bus routes
and detours.
Please visit the Metro website www.metroinfo.org.nz or phone Metro Info on 366 8855 for any bus service changes.
Bower Ave, Parklands
• From
25 January Bower Ave has a road closure between Queenspark
Drive and Rue de la Mare while wastewater work is underway
near the intersection of Queenspark Dr and Bower Ave.
•
Temporary traffic lights will maintain access to and from
Queenspark Dr from the southern side of the Bower Ave
intersection.
• Queenspark Drive will be
one-way for westbound traffic only, between Chadbury St and
Inwoods Rd, for about 2 weeks.
• The best
detours to the Parklands Marae are: Inwoods Rd to Broadhaven
Ave to Lamorna or Beach Rd to Donnington Rd. Please continue
to support the shops at the Parklands Mall.
Marine Parade, New Brighton
A
progressive one-way system is in place for road renewal
between Beach Rd and Pacific Rd for southbound traffic.
ENDS