SCIRT Traffic Update for the week starting Monday 25 July
SCIRT Traffic Update for the week starting Monday 25 July 2016
Central
City
• Stage 2 of SCIRT work on
the Fitzgerald Avenue twin bridges, the
installation of a new manhole, continues. Two-way traffic is
maintained on Fitzgerald Ave but there are no right turns
across the intersection of Fitzgerald Ave, Avonside Drive
and Kilmore St.
St Albans
•
The intersection of Westminister St, Roosevelt St
and Courtenay St is closed while an intersection
upgrade is carried out including removal of the roundabout.
Please use Cranford St, Innes Rd and Rutland St to detour
around the worksite.
• Warrington
St is one-way heading east for road repairs for one
more week. Westbound traffic will be detoured to Edward Ave.
The intersections of Warrington St
and Frances Ave and Warrington St and Flockton St
will be closed.
• Edgeware Rd,
between Hills Rd and Geraldine St, is one-way eastbound.
Traffic going west from Hills Rd is being detoured into
Edward Ave and Barbadoes St. The one-way is expected to end
in August.
Merivale
• SCIRT
is working at the western end of Aikmans Rd
which will be in part one-way eastbound while wastewater
repairs take place over 4-6 weeks. For westbound traffic on
Aikmans Rd the detour is Akela Street, Cox St, Sterling St
and Office Rd.
Avonside/Linwood
•
Woodham Rd is closed at the intersection
with Worcester St for 3 more months for major wastewater
repairs. Access to Woodham Rd, east of Worcester St, will be
via Sewell St and Rowcliffe Cres. Eastbound traffic on
Woodham Rd will be diverted via Ngarimu St.A “no entry”
sign is in place in Woodham Rd at Kerrs Rd
and at Ngarimu St.
•
Carnarvon St at the intersection with
Woodham Rd is closed for wastewater
repairs.
Richmond
•
North Avon Rd is closed between North
Parade and Flesher Ave for wastewater works. The detour will
be North Parade, Medway St to River Rd. The road closure is
scheduled to be lifted in October.
• The
intersection of Stapletons Rd and Dudley St
is closed for about 3 months. Stapletons Rd is one-way
southbound between Averill St and Randall St. Best access is
via Shirley Road.
Bromley
•
On Dyers Rd wastewater
repairs are continuing. Two-way traffic is maintained but
expect delays. The work is between Ruru Rd and Maces
Rd, and is mostly in the centre of the road.
Turning restrictions are in place on several streets in the
area.
Redcliffs
• SCIRT
is working on Main Rd in Moncks Bay for 3
months repairing an earthquake-damaged culvert. Two-way
traffic will be maintained with lane shifts past the work
site.
New
Brighton/Burwood
• Travis
Rd, between Anzac Drive and Bower Ave, will have
work underway for about 2 months. Traffic will return to the
two-way but please take care.
• SCIRT has
started decommissioning now redundant wastewater pipes in
New Brighton Rd, Lake Terrace Rd and Baker
St. The work with take about a month. Two-way
traffic is maintained.
Aranui –Wainoni
This area
has several road closures. Please take care. SCIRT is
installing a new more earthquake-resilient vacuum wastewater
system. See theAranui map for road closures, bus
routes and detours.
• Kerb, channels and
footpath repairs have started on Pages Rd
between Shuttle Drive (Cowles Stadium) and Portchester St
and will take about 6 weeks. Two-way traffic will be
maintained.
• Breezes Rd
between Cuthberts Rd and Anzac Drive will have a stop/go
system in place from Monday 25 July for about 6 weeks for
kerb and channel replacement.
• Breezes
Rd, between 237 and Gosport St, is one-way
northbound until late August. This section is between Pages
Rd and Wainoni Rd.
• Breezes
Rd is one-way eastbound between Pages Rd and
Cuthberts Rd. The detour is Cuthberts Rd, Nugent St,
Shortland St, Pages Rd.
• Shortland
St is one-way between Carters Rd and Pages
Rd.
• Doreen St is closed at
Breezes Rd.
• Marlow
Rd is eastbound between Eureka St and Pages
Rd.
Port Hills/Lyttelton/Governors
Bay
• Godley Quay,
Lyttelton, between Cyrus Williams Quay and Voelas
Rd is down to one lane to replace an earthquake-damaged
water main. Traffic is being maintained in both directions
with temporary traffic lights. The repairs will take about
another 2 months.
• Governors Bay
Rd is reduced to one lane on the Lyttelton side of
the intersection with Dyers Pass Rd, while SCIRT lays a new
water main. Two-way traffic will be maintained with Stop/Go
temporary traffic lights.
• Governors
Bay Rd outside number 903 will have storm water
replacement work carried out for about 5 days starting 21
July. One lane will be open with two-way traffic maintained
by stop/go management.
Parklands
•
Beach Rd is one-way between Pinewood Ave and Bower Ave until
mid-September for wastewater, storm water, kerb and channel
and carriageway repairs.
• Flemington
Ave is closed until the end of August. Please use
Pinewood Ave.
• Queenspark Drive,
between Broadhaven Ave and Chadlington St, has road
renewal work from Monday 11 July for about 3 weeks. Two-way
traffic will be maintained using priority giveway.
•
Queenspark Drive, between Ashwood St and
Branksome Place, is closed while road renewal tales place
from Monday 18 July for about 2 weeks.
•
The Bower Ave and Broadhaven Ave
roundabout intersection is closed until the end of
August. Traffic lights will maintain two-way traffic along
Bower Ave until August.
• Broadhaven
Ave between Wisteria Place and Anglesea Ave is
one-way westbound including the Inwoods Rd
intersection.
• Donnington St
is closed until the end of July for road
resurfacing.
• Sylvia St is
closed the week of 1 August for about a month for road
resurfacing.
• If you would
like to receive a fortnightly Parklands Traffic Update
please email CIRinfo@fcc.co.nz or eqinfo@downer.co.nz
ends