WorkSafe accepts enforceable undertaking from Fletcher

WorkSafe accepts enforceable undertaking from Fletcher Construction
WorkSafe New Zealand has accepted an enforceable undertaking from Fletcher Construction Company Limited, following an incident in May 2016 where a worker was injured by a temporary wall which collapsed following a high-rain event.

The worker was working in a two meter deep hole where temporary concrete blocks were being used as a retaining wall. Water was being pumped out of the hole following heavy rainfall. The worker was attaching plywood to the blocks to stop aggregate being washed under the temporary concrete block wall when the concrete blocks started to shift. He was unable to get far enough away before he was caught under the falling blocks and plywood.

The victim sustained multiple fractures to his right lower leg. The incident required eight months off work as a result of his injuries.

Following its investigation into the incident, WorkSafe found that Fletcher Construction had failed under the Health and Safety at Work Act 2015 to ensure, so far as was reasonably practicable, the health and safety of a worker.

This is the tenth enforceable undertaking accepted by WorkSafe under the Health and Safety at Work Act 2015; a tool that is increasingly being used, in appropriate cases, as a positive alternative to prosecution.

WorkSafe’s Deputy General Manager, Investigations and Specialist Services Simon Humphries said the decision to accept the enforceable undertaking was appropriate given the circumstances.

Advertisement - scroll to continue reading

“This is not an opportunity for Fletcher Construction to escape their corporate responsibility for the health and safety of a worker. It’s a legally binding agreement that requires them to complete a number of commitments, which will benefit health and safety in the wider construction industry. WorkSafe has a dedicated team monitoring compliance with the enforceable undertaking and ensuring that Fletcher follow through on their promises.”

The victim confirmed that he accepted the enforceable undertaking as an acceptable alternative to prosecution.

Under the enforceable undertaking, Fletcher Construction committed to initiatives including:
• Providing amends in the form of payment to the victim, professional development opportunities in addition to ACC top-up.
• Developing a new temporary works procedure for workers, including visual aids and training.
• Arranging for an external consultant to audit the use of the temporary works procedure to verify ongoing effectiveness.
• Assisting in the development of programmes with Site Safe regarding temporary works.
• Presenting to Civil Contractors New Zealand conference focusing on safety in temporary works design.
• Donating to the New Zealand Institute of Safety Management.
• Establishing a health and safety forum with labour hire companies.
• Publishing an article about health and safety and temporary works in an industry publication.
• Developing a health and safety module for Mahurangi College.
• Providing work experience for Mahurangi College students.
• Running a community open day.
• Donating safety equipment to a local school.

Fletcher Construction’s Chief Executive Michele Kernahan said the division has committed an immense amount of time, and resource in recent years to improving its safety record.

“We deeply regret this incident occurred and that a worker on one of our sites was harmed,” she said. “Everyone deserves to go home safe at the end of the day and it is disappointing that we let this person down by not fully recognising the risks in the works on that site, in that environment.”

“It is important that we collectively learn from this as an organisation and as an industry. Temporary works are a challenging area which require collaboration, consistent understanding and shared learning between designers, contractors and suppliers to create a safe work environment.”

“We welcome the opportunity that this undertaking provides for us to improve the safety of temporary works on our sites and hope the changes we make as a result, will benefit practices across the construction industry.

Ms Kernahan said as there is currently no New Zealand standard for temporary works the company will develop and implement its new temporary works procedure, guided by the British Standard or Code of Practice (BS5975:2008).

The full enforceable undertaking together with WorkSafe’s reasons for its decision is available at: https://worksafe.govt.nz/laws-and-regulations/enforceable-undertakings/accepted-enforceable-undertakings/the-fletcher-construction-company-limited/
WorkSafe will continue to monitor compliance of this enforceable undertaking.
ENDS